…it’s doors to the public tomorrow, Friday at 6pm.

It has been our first experience working with cross-laminated-timber panels and it was a great experience all around. The box, as we call it, is 54′ x 12′-6″ x 19′-6″ high and weighs about 50,000Lbs.

It took the nice and capable guys from Bensonwood (out of NH) only 3 days to assemble it. Most of the CLT was left exposed and was just sealed with OSMO oil.

All electric installations are surface mounted. The openings were closed with a Modulit500 / glass combination installed by Bopart-NY.

General Contractor: Deary Construction
Reception desk: Hooked on Wood
Metal work: Andreas Padazo
Floor: Hudson Concrete Polishing
Electric: Claude Martz
This project is a collaboration with Dominik Dippelhofer.
Great team!